Each stage is selected around the slurry, the geology and the disposal route. Open a stage to see what it contributes to the process.

  1. 01Raw slurry
  2. 02Screening
  3. 03Desanding
  4. 04Slurry conditioning
  5. 05Filter press
  6. 06Filtrate and water recovery
  • Filter cakeDewatered cake is stacked, transported and disposed of at a fraction of the original slurry volume.

Solutions by application

Start from the slurry your project produces. Each application page explains typical slurry characteristics, the recommended treatment process and the equipment configuration.

All solutions

Bentonite Slurry Dewatering

Bentonite Slurry Dewatering

Turning spent bentonite suspensions into stackable cake and reusable water.

Explore solution

Construction Sludge Dewatering

Construction Sludge Dewatering

Excavation, diaphragm wall and wash-water sludge, reduced to a transportable cake.

Explore solution

Industrial Sludge Dewatering

Industrial Sludge Dewatering

Process and wastewater sludge dewatering, with the filtration cycle matched to the sludge chemistry.

Explore solution

Our core dewatering technologies

Chamber, membrane and automatic filter presses are the core of every DELIAN system and are configured around the required cake moisture and throughput.

All equipment

Automatic Filter Press

Automatic Filter Press

Automated filtration cycles for continuous industrial operation.

Filtration area
10 – 200 m²
Filtration pressure
0.6 – 1.6 MPa
Capacity range
5 – 100 m³/h slurry feed

View product

Chamber Filter Press

Chamber Filter Press

Plate-and-frame dewatering for construction and industrial slurry.

Filtration area
10 – 250 m²
Filtration pressure
0.6 – 1.6 MPa
Capacity range
5 – 120 m³/h slurry feed

View product

Closing & Plate-Shifting Systems

Closing & Plate-Shifting Systems

Closing units, plate shifters and the retrofit that turns a manual press automatic.

Filtration area
Filtration pressure
Capacity range
drive sized to the plate weight

View product

Thickener tank fabricated and pre-assembled in the works

Plant equipment

Thickeners, sized from the settling test

A thickener takes the cheapest water out of a slurry: the tank settles the fines, the rake draws them to the centre and the overflow returns to the circuit — so the filter press is sized on the underflow rather than on the whole flow.

View thickeners

Microtunneling Slurry Treatment

Microtunneling & pipe jacking slurry treatment

Efficient separation and dewatering for bentonite and construction slurry generated during microtunneling and pipe jacking operations.

  1. 01 Slurry
  2. 02 Screening
  3. 03 Desanding
  4. 04 Conditioning
  5. 05 Filter press
  6. 06 Water recovery
  7. 07 Filter cake

Explore microtunneling solutions

Engineered around your slurry

Equipment selection follows the slurry, not the other way round. The four steps below are how a DELIAN dewatering solution is put together.

  1. 01

    Slurry testing

    Process evaluation based on actual slurry characteristics.

  2. 02

    Process design

    Equipment and process selection based on capacity, solids concentration, geology and target cake moisture.

  3. 03

    System integration

    Filter press combined with slurry conditioning, screening, separation and water recovery where required.

  4. 04

    Global support

    Installation, commissioning, training, spare parts and technical support.

Project references

Applications, capacities, equipment configuration and measured results from delivered projects.

View all projects

Industrial sludge dewatering

Industrial sludge dewatering

Treatment capacity
2 × 40 m³/h
Filter press model
2 × automatic press, 1250 × 1250 mm
Cake moisture
22 – 30 % dry solids

View project

TBM slurry treatment

TBM slurry treatment plant

Treatment capacity
300 m³/h
Filter press model
4 × membrane press, 1250 × 1250 mm
Cake moisture
35 – 45 % dry solids

View project

Microtunneling slurry treatment

Microtunneling slurry dewatering

Treatment capacity
90 m³/h
Filter press model
2 × chamber press, 1000 × 1000 mm
Cake moisture
30 – 35 % dry solids

View project

Engineered around real slurry conditions

Every dewatering plant is sized around the measured slurry: volumetric capacity, solids concentration, particle size distribution and the required cake moisture. Slurry testing comes first, equipment selection second.

Tell us about your slurry

The specialists for slurry treatment & dewatering

We design and build solid-liquid separation and sludge dewatering systems for tunneling, microtunneling, pipe jacking and industrial plants — from slurry testing and process design to commissioning and spare parts.

About DELIAN

DELIAN works — grit blasting hall

Tell us about your slurry

Every slurry is different. Send us your slurry characteristics and project requirements so our engineering team can evaluate a suitable dewatering solution.

  • Process evaluation based on real slurry data
  • Equipment and layout proposal for your capacity
  • Cake moisture and water recovery targets

No file selectedPDF, image, spreadsheet, document or ZIP archive. Maximum 10 MB.

Tell us about your slurry WhatsApp
Chat with DELIAN on WhatsApp